TENANT IMPROVEMENT CONTRACTOR · Port Coquitlam, BC · V3B 0A1

TI Framing
& Drywall
Port Coquitlam

— COLIN HAMILTON · 30 YRS BC CONSTRUCTION · 15 YRS GC

Full tenant improvement framing and drywall packages for general contractors and developers across Port Coquitlam. Colin Hamilton brings 15 years as a licensed GC and TI specialist to every estimate and site visit — understanding your project from the GC's perspective, not just the trades side.

📞 604-761-1518 ✉ Quote Request
👷 COLIN HAMILTON · Port Coquitlam TI
COMPANY
SteelStud.ca
GC EXPERIENCE
15 Years
STEELSTUD.CA
15 Years
TOTAL IN BC
30 Years
TI TYPES
light industrial office, professional services, retail
MOBILIZATION
48 Hours
SUBCONTRACTORS
Zero
DIRECT LINE
604-761-1518
30
YRS BC CONSTRUCTION
15
YRS AS LICENSED GC
48H
MOBILIZATION
0
SUBCONTRACTORS

Tenant Improvement
Contractor in Port Coquitlam

SteelStud.ca delivers complete tenant improvement framing and drywall packages across Port Coquitlam. We serve general contractors, developers, and project owners with a single-source TI scope that covers steel stud framing, drywall hang and tape, finish to specified level, and fire-rated assembly installation — all self-performed by our own crew.

What sets SteelStud.ca apart on Port Coquitlam TI projects is Colin Hamilton's background: 15 years as a licensed general contractor specializing in tenant improvement work before founding SteelStud.ca. Colin has managed full TI scopes as the GC — which means he understands exactly how framing and drywall work affects your schedule, your downstream trades, and your profitability. He estimates Port Coquitlam TI projects the way a GC thinks, not just the way a trades contractor thinks.

⚡ THE GC ADVANTAGE · WHY IT MATTERS ON YOUR Port Coquitlam TI PROJECT

Colin spent 15 years on the GC side managing light industrial office, professional services, retail projects across Metro Vancouver. He knows what a framing subcontractor looks like from the owner's chair — the ones who create problems and the ones who make projects run. SteelStud.ca was built to be the latter: accurate estimates, proactive coordination, clean documentation, and work that passes inspection first time. When Colin walks your Port Coquitlam TI site, he's thinking about your whole project schedule, not just the framing scope.

🏢
Office Fit-Outs
Open-plan and private office TI framing and drywall across Port Coquitlam. Partition systems, conference rooms, reception areas, server rooms, and executive suites. Commercial-grade precision throughout.
🏥
Medical & Dental TI
Medical clinic, dental office, and allied health TI packages in Port Coquitlam. Moisture-resistant board in wet areas, blocking for equipment mounting, plumbing chase soffits, and clean room-adjacent assemblies.
🛍️
Retail Build-Outs
Retail TI framing and drywall for Port Coquitlam commercial spaces. Fast-track schedules, tight tolerances for millwork, feature wall assemblies, and coordination with fixture installers.
🍽️
Restaurant & Hospitality
Restaurant TI framing in Port Coquitlam — kitchen partition walls, bar and service area assemblies, dining room features, and moisture-resistant board throughout food preparation areas.
🔬
Industrial & Tech
Light industrial office TI, tech campus fit-outs, and lab space framing across Port Coquitlam. Coordination with specialized MEP, server room assemblies, and high-load blocking for technical equipment.
🏛️
Mixed-Use & Multi-Tenant
Demising wall systems, suite separations, and multi-tenant TI packages for Port Coquitlam mixed-use developments. ULC-rated assemblies for suite separations and fire corridors throughout.

What's in Our
Port Coquitlam TI Package

Our TI packages are designed to give GCs a single-source scope for the framing and drywall envelope — one estimate, one crew, one point of contact. Here's what's included:

PHASE 1
Layout & Framing
Steel stud layout from approved drawings. Partition walls, demising walls, soffits, bulkheads, and ceiling systems. Blocking and backing per the blocking schedule. Coordination with MEP trades before framing begins. Door frame blocking and header installation throughout the Port Coquitlam TI space.
PHASE 2
Drywall Hang
Board supply, delivery, and installation. Standard, Type X, and moisture-resistant board as specified. Correct fastener patterns for structural and fire-rated assemblies. Shaft wall board installation where required. Pre-inspection review of all fire-rated assemblies before board close-in on Port Coquitlam projects.
PHASE 3
Tape & Finish
Taping, bedding, and finish coats to specified level (L1 through L5). Corner bead installation — metal, vinyl, or paper as specified. Ceiling-to-wall transitions. Sanding to specified surface profile. Coordination with painter for primer and finish coat scheduling on your Port Coquitlam TI project.
PHASE 4
Documentation & Inspection
ULC assembly documentation for all rated assemblies. Framing inspection coordination with Port Coquitlam City Hall Building Division. Deficiency correction and reinspection if required. Completion sign-off and handover to the GC with full documentation package for the Port Coquitlam project file.

TI Permits &
Inspections in Port Coquitlam

Tenant improvement projects in Port Coquitlam require a building permit for any work involving structural elements, fire separations, change of occupancy, or modification of means of egress. Our framing and drywall scope is documented to permit standards — ULC assembly references, structural specifications, and fastener schedules are all included in our package for your permit application.

⚠ PERMIT OFFICE · Port Coquitlam TI PROJECTS

Office: Port Coquitlam City Hall Building Division
Address: 2580 Shaughnessy St, Port Coquitlam, BC V3C 2A8

Colin's 15-year GC background includes extensive experience with Port Coquitlam's permit process. Our documentation package is prepared to the standards that Port Coquitlam City Hall Building Division expects — reducing permit review times and avoiding requests for information that delay your Port Coquitlam TI project timeline.

Our TI Process
in Port Coquitlam

01
Estimate
Send drawings. Colin personally reviews the scope and provides a detailed TI estimate — framing, drywall, finish level, blocking schedule, and timeline — within 24–48 hours.
02
Pre-Construction
Colin attends your pre-construction meeting for the Port Coquitlam TI. Framing layout reviewed, MEP coordination confirmed, blocking schedule finalized before crew arrives.
03
Execution
Crew mobilized to Port Coquitlam within 48 hours of contract. Daily progress updates to GC. Proactive flagging of field conditions that affect scope, schedule, or downstream trades.
04
Handover
Framing and drywall complete, inspections passed, surfaces ready for painter. Complete documentation package delivered to GC for the Port Coquitlam project record.

Port Coquitlam TI Coverage

We cover all of Port Coquitlam including the Port Coquitlam Downtown & Poco Trail Network district and surrounding communities. Same Colin Hamilton, same crew, same standard — whether your TI is a small professional office or a full-floor commercial fit-out.

Why Port Coquitlam GCs Choose
Colin Hamilton for TI

🎯
15 Years as a GC
Colin ran TI projects as the GC for 15 years. He estimates and manages your Port Coquitlam TI scope the way a GC thinks — understanding your whole project, not just the framing.
📞
Direct Access to Colin
604-761-1518 reaches Colin directly. No account managers. The person who estimates your Port Coquitlam TI is the person who manages it and is on site.
🔗
Single-Source Package
Framing + drywall from one contractor. One estimate, one crew, one point of contact. No coordination gap between your framer and drywaller on Port Coquitlam projects.
Fast Turnaround
Estimates within 24–48 hours. Crew mobilized within 48 hours of contract. We understand that TI schedules in Port Coquitlam don't move for slow subcontractors.
📐
Inspection-Ready Work
30 years of BC construction means our Port Coquitlam TI work is framed and drywalled to pass inspection first time — because Colin knows what inspectors look for.
📋
Complete Documentation
ULC references, permit documentation, shop drawings. Our Port Coquitlam TI package gives your permit application everything it needs to move through Port Coquitlam City Hall Building Division without delays.
COLIN HAMILTON · STEELSTUD.CA · Port Coquitlam, BC

TI Quote for
Port Coquitlam?

604-761-1518
30 YRS BC CONSTRUCTION · 15 YRS GC · FRAMING + DRYWALL · Port Coquitlam
📞 CALL COLIN — 604-761-1518   ✉ EMAIL COLIN