604-761-1518 frameinsteel@gmail.com

Tenant Improvement Contractors Vancouver

Together We Build Relationships & Structures

 TI Contractors Vancouver

Tenant Improvement Permit System (TIPs)

Your Tenant Improvement Specialists for an alternative permit-issuing process for renovation projects which require a building permit or a development-building permit.

We are informed about TIPs list of eligible buildings for spaces in Vancouver for 2007 Building bylaw’s to the present Building codes and bylaw’s.

SteelStud.ca can give you a breakdown for all costs regarding your TI and make sure your renovation goes smoothly and efficiently. We are the steel stud and drywall company that are also General Contractors.
Giving you the best in from any Tenant Improvement contractors InVancouver for steel stud & drywall contracting prices and that are more than competitive. If you are just looking for us as your framing and drywall contractors or as your General contractor we are happy to work with you on any portion or the whole contract just the same.

No matter how complex or the size of you Tenant Improvement(TI) we are here to assist you on a design and build. Tenant Improvements can also be a store or a restaurant and we are ready to help you on these TI’s as well. We have been working on construction projects and Tenant Improvement contractors in Vancouver are for several decades and there is not much we have not been a part on.

Our Speciality

Z

Tenant Improvements Design & Build

Z

Ceilings Walls & Floors Contracting

Z

Steel Stud Framing Contractors

Z

Drywall Boarding & Taping Contractors

Z

Demolition & Disposal

Our Speciality

Z

Submitted All Drawings For TI in Vancouver

Z

Submitted Structural Drwaings to Vancouver Facility Planning & Development

Z

HVAC - Plumbing - Sprinkler - Electrical Drawings

Z

Get Approval Letter from Vancouver FPD

Z

Proceed with Permit Application for Construction

Z

Obtain Building Permit from City Building Review Branch

Z

Hazordous Materials Reports - Possible Abatement Work

Z

Submitted Construction Schedule to FPD

Z

Submitted Letter from Prime Contractor

Z

Copies of Letters of Assurance from all Sub Contractors

Z

Copies of Letters of Assurance from all Sub Contractors

Z

Get Moved into Your New Faciltiy to do what you Do Best

Z

We Make Your TI Contractors Vancouver Process Easy

Z

We're More Thank Happy To Do One Portion Or the Entire Tenant Improvement Project for you

Z

Call for a Free Vancouver TI Consultaion 604-761-1518

TI Contractors Vancouver Step By Step

Submitted all design drawings of proposed tenant improvements including but not limited to architectural/interior design as required of the City of Vancouver development permit review branch, for review and approval, to City of Vancouver Facilities Planning and Development (FPD) prior to submission for development permit.

Submitted all drawings of proposed tenant improvements including but not limited to architectural/interior design, structural, mechanical and electrical to show new and changes/alterations to building systems such as HVAC, plumbing, fire protection sprinkler system, and power, for review and approval, to FPD prior to submission for building permit.

Received Tenant Improvement (TI) Review Letter from City of Vancouver Facilities Planning and Development to

Proceed with development permit application and/or building permit application for construction.

Submitted drawings/documents on any changes to scope of work not outlined in the TI Review Letter to FPD for approval.

Obtained building permit from the City Building Review Branch prior to construction.

Received and reviewed hazardous materials reports, if applicable, from City of Vancouver Environmental Services (attached to TI Review Letter).

If hazardous materials are present in the project area, retained the services of an environmental consultant and/or hazardous material abatement contractor from the approved lists provided by the City of Vancouver Environmental Services to perform the abatement work. Submitted names to FPD.

For hazardous materials on site, received approval of WorkSafeBC procedures from City of Vancouver Environmental Services prior to commencing construction.

Submitted a copy of the construction schedule to FPD.

Construction Phase

Submitted a letter, signed by the General Contractor or other party responsible to be the “Prime Contractor” for the project, declaring qualifications and responsibility for construction safety.

Submitted copies of letters of assurance from certified registered professionals as required of the City of Vancouver Building Review Branch to FPD.

Submitted a copy of the Building Permit and all trade (including electrical and plumbing) permits to FPD. Submitted a copy of the fire alarm verification report if applicable to FPD.
Submitted a copy of the Occupancy Permit to FPD.

Before & After TI Projects Vancouver

[twenty20 img1=”783″ img2=”758″ offset=”0.5″]
[twenty20 img1=”782″ img2=”761″ offset=”0.5″]
[twenty20 img1=”335″ img2=”336″ offset=”0.1″]
[twenty20 img1=”745″ img2=”750″ offset=”0.1″ ]
[twenty20 img1=”550″ img2=”549″ offset=”0.1″]